Power System Studies & Simulation.

Power system studies for new projects and operating assets. We assess load flow, short circuit, protection coordination, arc flash, power quality and grid integration against the agreed project basis, helping your team make decisions during planning, design, commissioning and operation.

Illustrative image
DeliveryRemoteOn Site
DisciplinesElectrical
Built ForOwners & DevelopersEPC ContractorsOEMsPlant Heads
Project Delivery

Supporting projects in India, Africa, Australia and other international markets. Local requirements, delivery arrangements and any site support are confirmed for the agreed scope.

Explore Global Delivery

Engineering Scope.

Twelve studies. Each one answers a single question, before equipment is bought.

Load Flow

Can the network carry the load in every operating case?

Explore Load Flow Services →

Short Circuit

What fault duties must the agreed equipment-rating checks assess?

Explore short circuit studies

Relay Coordination

Will protection isolate a fault fast, and only where it should?

Explore relay coordination

Arc Flash

What is the hazard at each switchboard, and the PPE it needs?

Explore Arc Flash Services →

Earthing

Is the site safe for people during an earth fault?

Harmonics & Power Quality

How do nonlinear loads and network conditions affect distortion and resonance?

Explore harmonic analysis

Transient Studies

What happens in the milliseconds after a switch, fault or strike?

Insulation Coordination

Are insulation levels and arresters right for the overvoltages?

Explore insulation coordination

Motor Starting

Will large motors start without pulling the voltage down?

Grid Code Compliance

Will the utility approve the connection first time?

Battery Sizing

How much storage, at what power and for how long?

Microgrid Simulation

Does the system stay stable once it separates from the grid?

Also available: contingency and reliability, dynamic RMS simulation, stray current, traction harmonics, EV charging load impact, and N+1 / 2N redundancy for critical facilities.

At Each Project Stage.

Where you are in the Project decides what you need from us.

Feasibility & Concept

Validate viability and size the system before capital is committed.

  • Load flow and network performance
  • Renewable and BESS grid integration feasibility
  • Techno-economic sizing basis

Detailed Design

Set the ratings and settings the whole design depends on.

  • Short circuit and protection coordination
  • Arc flash hazard analysis
  • Insulation coordination and transients
  • Harmonic and grid code compliance

Tender & Procurement

Confirm equipment ratings match the studies before you order.

  • Equipment rating verification against study results
  • Technical bid review

Construction

Studies are frozen; site queries reference them, not repeat them.

  • Design-basis clarifications
  • Settings confirmed for panel and relay ordering

Pre-Commissioning & Commissioning

Prove the settings on the real network before energisation.

  • Relay setting verification support
  • As-built model reconciliation

Operation & Maintenance

Re-study as the network, load or standard changes.

  • Arc flash re-study, typically every 5 years
  • Studies for retrofits, expansions or new loads
  • Harmonics and power quality troubleshooting

Proof in Practice · Pharma · Power Quality

Resolving Power Quality Challenges in a Dual-Source 33 kV API Facility

Diagnosing and fixing power quality problems in an API plant supplied from two 33 kV sources.

Sector
Industrial & Process Plants
Year
2025
Read the Case Study

Which power system study do you need?

Start with the decision: normal network performance, fault duty, protection, arc-flash exposure, overvoltages or harmonic distortion. More than one study may be needed; agree the cases and interfaces before work begins.

On a small screen, scroll the comparison horizontally. Keyboard users can focus the table area and use the arrow keys.

Six study types: the decision each supports and its scope limits
StudyMain engineering questionWhat to keep separate
Load flowVoltage, loading and power flows in defined operating cases.It does not establish fault duty or protection selectivity.
Short circuitProspective fault currents and the agreed equipment-duty checks.It does not by itself provide relay coordination or arc-flash labels.
Relay coordinationProtective-device responses and settings for relevant fault conditions.Settings recommendations need implementation and appropriate testing.
Arc flashIncident energy and boundaries for the agreed equipment, cases and method.It does not remove the hazard or replace an electrical safety programme.
Insulation coordinationInsulation levels and protective arrangements against relevant overvoltages.It is distinct from a routine insulation-resistance test.
Harmonic analysisDistortion, network resonance and agreed mitigation cases.It does not explain every power-quality disturbance.

The studies should use a consistent network basis where their scopes overlap. For example, fault-study results can inform a protection review, and the relevant clearing times can inform an arc-flash assessment. One report title does not imply that every discipline or operating case is included.

Prepare the common and study-specific inputs

See how the study scopes connect in practice.

Network and protection review

The published distribution-system case describes network modelling, load-flow and short-circuit studies within a relay-coordination review.

Read the distribution-system case study

Power-quality investigation

The published dual-source API-facility case describes an investigation across two incoming supplies, with findings used to guide plant-specific corrective measures.

Read the power-quality case study

These published examples provide project context, not a guarantee for another installation. Client identities and confidential material are not disclosed here.

How We Work on It.

The method behind every engagement. The detail is set out in the proposal and the design basis.

01Define the QuestionWhat decision this study must answer, to what standard.
02Collect DataSingle-line, equipment and utility data.
03Build and ValidateModel checked against known operating points.
04Run the CasesNormal, contingency, fault and time-series.
05ReportSigned, results carried into ratings and settings.
Power System Study Input ChecklistWhat to send before a study starts: single-line, equipment data, utility data and operating cases.
Open Power System Study Input Checklist

Inputs and Deliverables.

A practical starting point and the Engineering outputs to agree for your Project.

01 / Starting information

What We Need from You

  • Single-line diagram
  • Equipment data: transformers, cables, generators, motors, protection
  • Utility fault levels and connection requirements
  • Load, generation and operating scenarios
  • The standard or grid code the study must meet

Send what is available. We will identify missing information before confirming the scope and programme.

02 / Agreed outputs

What You Receive.

  • Study report with assumptions, cases, results and recommendations
  • Protection setting schedules
  • Arc flash results and mitigation plan
  • Harmonic filter design, where needed
  • Grid code compliance results
  • Study models, on request

The exact deliverables are fixed in the agreed scope for each Project.

Standards and Compliance.

We engineer to the standards and regulations that govern your Project, fixed in the design basis.

International StandardsIEC, IEEE, ISO, ASME and API standards, as the Project requires.
National CodesThe codes of the country where the asset is built: BIS and CEA in India, NEC in the USA, BS in the UK, EN in Europe, AS/NZS in Australia, GSO and SASO in the Gulf.
Utility & Authority RequirementsGrid codes, utility specifications and the approvals of the connecting authority.
Client & Lender SpecificationsOwner, licensor and lender requirements, fixed in the design basis.

Typical references for this Service: IEC 60909, IEEE 1584, IEEE 80, IEEE 519, IEC 60071.

Applicable standards and editions are agreed and fixed in each Project's design basis.

How We Assure the Work

ISO 9001:2015-alignedEngineer-signedDocument-controlledIndependentConfidentialRegistered company

Related Services.

Engineering Design

Where study results become drawings.

View

Technical Audits & Assessments

Arc flash and PQ in operating plants.

View

Testing & Commissioning

Settings proven on site.

View

Questions Clients Ask.

What is the difference between load flow, short-circuit and relay coordination studies?

Load flow assesses steady-state voltages, equipment loading and power flows for defined operating cases. A short-circuit study assesses fault conditions and the resulting duties. Relay coordination evaluates protective-device operation against those fault cases and the agreed protection criteria. The studies answer different questions and may be combined in one appointment.

Explore load flow analysis →
What information is needed for a relay coordination study?

Start with the single-line diagram, network configurations, available fault-level data, equipment records and current relay settings. Relay models and functions, CT/VT information, breaker operating data, utility criteria and trip or test records may also be needed. The scope should identify missing inputs and define which protection functions and cases will be assessed.

Explore relay coordination →Prepare your study inputs →
What is coordinated in an insulation coordination study?

The assessment considers equipment insulation withstand levels in relation to the overvoltages and protective measures relevant to the installation. The network, equipment ratings, surge arrester application and relevant operating cases form part of the study basis. The applicable method and acceptance criteria are established for the project.

Explore insulation coordination →
Is an engineering study the same as site testing and commissioning?

No. A study evaluates the defined system using documented inputs, assumptions and assessment cases. Site testing and commissioning verify specified equipment and scheme behaviour through an agreed procedure. Settings implementation, testing and commissioning should be explicitly included where required; a study report alone does not prove that a site change has been applied or tested.

Explore testing and commissioning →
What information is needed to start a power system study?

Share the available single-line diagram, equipment and protection data, utility or source information, load and generation scenarios, and applicable project requirements. Send what is available; missing information can be identified before the scope and programme are confirmed.

Open the Power System Study Input Checklist →
What deliverables will a power system study include?

The agreed scope defines the deliverables. These can include a report with assumptions, operating cases, results and recommendations, together with relevant protection schedules, arc flash results, mitigation recommendations or other study-specific outputs. Model handover and additional support should be agreed in the proposal.

Do you support projects in India and overseas?

ETPL is based in Surat, Gujarat, with India as its primary market. We also welcome engineering project enquiries from Africa, Australia and other international markets. Applicable local requirements, client specifications, delivery arrangements and any site support are confirmed for each project.

Explore Global Delivery →
Which studies do you carry out?

Load flow including time-series load flow, short circuit, relay coordination, arc flash, harmonics, transient stability and electromagnetic transients, insulation coordination, grid code compliance, battery sizing, microgrid simulation, earthing and motor starting.

Can you prepare grid connection studies?

Yes, renewable and BESS integration and grid code compliance studies for the connecting utility.

Can you study an existing plant?

Yes. Arc flash, protection and harmonic studies are often the first step to a safer plant.

Read more: Power Quality Audits: Reading Harmonics, Sags and Flicker →
Can you review another consultant's study?

Yes, as Owner's or Independent Engineer, but not where we are also the Detailed Engineer.

Read more: Owner's Engineer or Detailed Engineer: Which Appointment Do You Need? →

Where This Service Applies.

This Service appears in the scope of 6 Sectors. Select a Stage to see the full scope for that Sector.

Cookie Consent Banner by Real Cookie Banner