Power System Study Input Checklist.
Start with the available network, equipment and operating records. Use the common checklist and the study-specific additions to agree the inputs, assumptions and scope.
Common inputs for every study.
A current single-line diagram, equipment/source data, relevant operating cases and the engineering decision are the starting point. The exact inputs depend on the selected study and available records.
Network
Equipment
Operation
Purpose
What additional inputs does each study need?
Use the common list first, then add the records relevant to the agreed study. Missing information should be recorded and resolved through the project scope rather than silently assumed.
Record the drawing revision, data source and date for important inputs. Mark an item as unavailable where appropriate and identify who can confirm it. This checklist helps define a study; it is not a substitute for an agreed engineering scope.