Elegrow TechnologyEngineered to Evolve Discuss Your Project

Home / Insights / Case Study

Pharma · Power Quality · 2025

Power Quality Assessment at a Dual-Source 33 kV API Facility

Root causes investigated across both supplies to guide plant-specific corrective measures.

Sector
Industrial & Process Plants
Project year
2025
Location
India
Illustrative engineer reviewing a power-quality analyzer at an industrial switchboard
Illustrative engineering image

The challenge

An Active Pharmaceutical Ingredient facility supplied from two 33 kV sources experienced power-quality problems affecting electrical reliability and equipment life. Earlier checks had not established the cause.

Our approach

  • Measured power quality at relevant locations across both incoming supplies.
  • Investigated the root causes across the two sources.
  • Recommended corrective measures suited to the plant’s operating conditions.

The outcome

The assessment identified the root causes across both 33 kV supplies and defined corrective measures for the facility. The recorded outcome was a diagnostic finding and action plan; the public case does not claim a quantified post-implementation improvement.

What this means for the owner

A facility with two supplies needs an assessment that considers both sources and their relationship to plant operation.

Client: Active Pharmaceutical Ingredient (API) manufacturer. This summary reflects the recorded project scope and outcomes. Project references are available subject to client confidentiality.

Cookie Consent Banner by Real Cookie Banner