The challenge
An owner of operating chemical plants needed to improve electrical safety and reliability without a full shutdown or system rebuild. The assessment had to consider the existing distribution network and the constraints of running facilities.
Our approach
- Assessed the existing electrical distribution system.
- Identified gaps affecting safety and reliability.
- Recommended improvements suited to implementation in operating plants.
The outcome
The engagement produced a prioritised improvement plan for the existing distribution systems. This gave the owner a basis for sequencing corrective work while considering ongoing plant operations. The published outcome is the improvement plan, rather than an unreported reliability percentage.
What this means for the owner
An existing plant can begin with a targeted assessment and prioritised actions before committing to a wider rebuild.
Client: Chemical manufacturer with running plants. This summary reflects the recorded project scope and outcomes. Project references are available subject to client confidentiality.