Elegrow TechnologyEngineered to Evolve Discuss Your Project

Textile Mill.

Spinning, weaving and processing mills. Many motors and drives, long operating hours and process heat.

Types We Engineer.

No two Textile Mill Projects are the same. Here is what changes from one type to the next.

Spinning

Many motors running continuously.

What We Focus On
  • Motor efficiency and power factor
  • Harmonics from drives

Weaving

Looms and drives in large halls.

What We Focus On
  • Distribution and cable sizing
  • Energy audits

Processing

Dyeing and finishing with heat and steam.

What We Focus On
  • Boilers and thermic fluid heaters
  • Heat recovery

Where This Asset Sits.

The Industrial & Process Plants power chain, and this asset's place in it.

Available for Projects In
Australia RemoteOn Site Enquire

Is This Where You Are?

Choose your role to see what we do and what to read next.

Across the Project Stages.

Where each part of the work sits in the life of a Textile Mill.

Stage 03Tender & ProcurementAvailable on request
Stage 04ConstructionAvailable on request
Stage 05Pre-Commissioning & CommissioningTesting & Commissioning
Stage 06Operation & MaintenanceTechnical Audits & Assessments

Standards and Compliance.

We engineer to the standards and regulations that govern the Project, fixed in the design basis.

International StandardsIEC, IEEE, ISO, ASME and API standards, as the Project requires.
National CodesThe codes of the country where the asset is built: BIS and CEA in India, NEC in the USA, BS in the UK, EN in Europe, AS/NZS in Australia, GSO and SASO in the Gulf.
Utility & Authority RequirementsGrid codes, utility specifications and the approvals of the connecting authority.
Client & Lender SpecificationsOwner, licensor and lender requirements, fixed in the design basis.

Typical references for this asset: IEC 60909, IEEE 1584, IEEE 80, IEEE 519, IEC 60071, ISO 50002.

Proof in Practice · Chemical · Reliability

Safety and Reliability of Electrical Distribution in Existing Chemical Plants

Improving safety and reliability in running chemical plants without a full rebuild.

Sector
Industrial & Process Plants
Year
2023
Read the Case Study

Planning a Textile Mill?

Share the asset, the location and the stage. An engineer will come back with a proposed scope.

Enquire Now



This will close in 0 seconds

Enquire Now


    This will close in 0 seconds

    Submit


      This will close in 0 seconds

      Enquire Now


      This will close in 0 seconds

      Enquire Now last



      This will close in 0 seconds

        This will close in 20 seconds

        New contact us form
        Subscribe For

        This will close in 0 seconds

        This will close in 0 seconds

          This will close in 0 seconds

          Cookie Consent Banner by Real Cookie Banner