Data Centre.

Hyperscale and colocation facilities. Uptime is the product, so redundancy has to be proven, not assumed.

Types We Engineer.

No two Data Centre Projects are the same. Here is what changes from one type to the next.

Hyperscale

Very large campuses for cloud and AI workloads.

What We Focus On
  • Substation and grid capacity for growth
  • High-density power distribution

Colocation

Multi-tenant facilities with tier commitments.

What We Focus On
  • Tier classification and redundancy
  • Testing before each hall goes live

Where This Asset Sits.

The Data Centres & Critical Facilities power chain, and this asset's place in it.

Project Delivery

Project location, local requirements and any site support are confirmed for the agreed scope.

Explore Global Delivery

Across the Project Stages.

Where each part of the work sits in the life of a Data Centre.

Stage 01Feasibility & ConceptPower System Studies & Simulation
Stage 02Detailed DesignEngineering Design
Stage 03Tender & ProcurementProcurement & Construction Support
Stage 04ConstructionAvailable on request
Stage 05Pre-Commissioning & CommissioningTesting & Commissioning

Standards and Compliance.

We engineer to the standards and regulations that govern the Project, fixed in the design basis.

International StandardsIEC, IEEE, ISO, ASME and API standards, as the Project requires.
National CodesThe codes of the country where the asset is built: BIS and CEA in India, NEC in the USA, BS in the UK, EN in Europe, AS/NZS in Australia, GSO and SASO in the Gulf.
Utility & Authority RequirementsGrid codes, utility specifications and the approvals of the connecting authority.
Client & Lender SpecificationsOwner, licensor and lender requirements, fixed in the design basis.

Typical references for this asset: IEC 60909, IEEE 1584, IEEE 80, IEEE 519, IEC 60071, IEC 61936-1.

Proof in Practice · Predictive Maintenance

10 Years of Breakdown-Free History

An eight-year relationship built on thermography, predictive maintenance and periodic arc flash analysis — and ten years without a breakdown.

Sector
Data Centres & Critical Facilities
Year
2023
Read the Case Study

Related Projects.

Selected engagements, described without confidential details.

Planning a Data Centre?

Share the asset, the location and the stage. An engineer will come back with a proposed scope.