Data Centre.
Hyperscale and colocation facilities. Uptime is the product, so redundancy has to be proven, not assumed.
Types We Engineer.
No two Data Centre Projects are the same. Here is what changes from one type to the next.
Hyperscale
Very large campuses for cloud and AI workloads.
What We Focus On- Substation and grid capacity for growth
- High-density power distribution
Colocation
Multi-tenant facilities with tier commitments.
What We Focus On- Tier classification and redundancy
- Testing before each hall goes live
Where This Asset Sits.
The Data Centres & Critical Facilities power chain, and this asset's place in it.
Is This Where You Are?
Choose your role to see what we do and what to read next.
Tier and N+1 / 2N studies, then UPS, ATS / STS and load bank testing.
Power budget, substation and BESS design sized for growth.
What We Deliver for This Asset.
Each line links to the Service that delivers it.
Across the Project Stages.
Where each part of the work sits in the life of a Data Centre.
Standards and Compliance.
We engineer to the standards and regulations that govern the Project, fixed in the design basis.
Typical references for this asset: IEC 60909, IEEE 1584, IEEE 80, IEEE 519, IEC 60071, IEC 61936-1.
Proof in Practice · Predictive Maintenance
10 Years of Breakdown-Free History
An eight-year relationship built on thermography, predictive maintenance and periodic arc flash analysis — and ten years without a breakdown.
- Sector
- Data Centres & Critical Facilities
- Year
- 2023
Related Projects.
Selected engagements, described without confidential details.
From Our Engineers.
Practical engineering notes related to this page.
Planning a Data Centre?
Share the asset, the location and the stage. An engineer will come back with a proposed scope.