Elegrow TechnologyEngineered to Evolve Discuss Your Project

Airport.

Terminal power and support infrastructure. Operations cannot pause for an electrical fault.

Types We Engineer.

No two Airport Projects are the same. Here is what changes from one type to the next.

Terminal Power

Supply to terminals and passenger systems.

What We Focus On
  • Redundancy and transfer
  • Distribution design

Support Infrastructure

Hangars, utilities and ancillary buildings.

What We Focus On
  • Substations and distribution
  • Testing and audits

Where This Asset Sits.

The Urban & Public Infrastructure power chain, and this asset's place in it.

Project Delivery

Project location, local requirements and any site support are confirmed for the agreed scope.

Explore Global Delivery

Across the Project Stages.

Where each part of the work sits in the life of a Airport.

Stage 01Feasibility & ConceptPower System Studies & Simulation
Stage 02Detailed DesignEngineering Design
Stage 03Tender & ProcurementAvailable on request
Stage 04ConstructionAvailable on request
Stage 05Pre-Commissioning & CommissioningTesting & Commissioning

Standards and Compliance.

We engineer to the standards and regulations that govern the Project, fixed in the design basis.

International StandardsIEC, IEEE, ISO, ASME and API standards, as the Project requires.
National CodesThe codes of the country where the asset is built: BIS and CEA in India, NEC in the USA, BS in the UK, EN in Europe, AS/NZS in Australia, GSO and SASO in the Gulf.
Utility & Authority RequirementsGrid codes, utility specifications and the approvals of the connecting authority.
Client & Lender SpecificationsOwner, licensor and lender requirements, fixed in the design basis.

Typical references for this asset: IEC 60909, IEEE 1584, IEEE 80, IEEE 519, IEC 60071, IEC 61936-1.

Planning a Airport?

Share the asset, the location and the stage. An engineer will come back with a proposed scope.

Cookie Consent Banner by Real Cookie Banner