Transmission Line.

Overhead lines from 66 kV to 765 kV. Every span, clearance and structure load has to hold across the real terrain.

Types We Engineer.

No two Transmission Line Projects are the same. Here is what changes from one type to the next.

66 kV to 132 kV

Sub-transmission lines between grid and distribution substations.

What We Focus On
  • Pole or lattice structures
  • Clearances in built-up areas

220 kV to 400 kV

Main transmission lines between grid substations.

What We Focus On
  • Lattice tower design
  • Insulation coordination and lightning performance

765 kV

The highest AC transmission class in India.

What We Focus On
  • Large-tower structural design
  • Corona, interference and clearances

Where This Asset Sits.

The Substations, Lines & Grids power chain, and this asset's place in it.

Available for Projects In
Australia RemoteOn Site Enquire

Is This Where You Are?

Choose your role to see what we do and what to read next.

Across the Project Stages.

Where each part of the work sits in the life of a Transmission Line.

Stage 01Feasibility & ConceptPower System Studies & Simulation
Stage 03Tender & ProcurementProcurement & Construction Support
Stage 05Pre-Commissioning & CommissioningAvailable on request
Stage 06Operation & MaintenanceTechnical Audits & Assessments

Standards and Compliance.

We engineer to the standards and regulations that govern the Project, fixed in the design basis.

International StandardsIEC, IEEE, ISO, ASME and API standards, as the Project requires.
National CodesThe codes of the country where the asset is built: BIS and CEA in India, NEC in the USA, BS in the UK, EN in Europe, AS/NZS in Australia, GSO and SASO in the Gulf.
Utility & Authority RequirementsGrid codes, utility specifications and the approvals of the connecting authority.
Client & Lender SpecificationsOwner, licensor and lender requirements, fixed in the design basis.

Typical references for this asset: IEC 60826, IEC 60071, IEC 60909, IEEE 1584, IEEE 80, IEEE 519.

Proof in Practice · Utility · Protection

Relay Coordination for a Distribution System

A medium-voltage utility network with rising faults and outages: revised relay settings for selective, faster fault isolation.

Sector
Substations, Lines & Grids
Year
2023
Read the Case Study

Related Projects.

Selected engagements, described without confidential details.

Planning a Transmission Line?

Share the asset, the location and the stage. An engineer will come back with a proposed scope.

Enquire Now



This will close in 0 seconds

Enquire Now


    This will close in 0 seconds

    Submit


      This will close in 0 seconds

      Enquire Now


      This will close in 0 seconds

      Enquire Now last



      This will close in 0 seconds

        This will close in 20 seconds

        New contact us form
        Subscribe For

        This will close in 0 seconds

        This will close in 0 seconds

          This will close in 0 seconds

          Cookie Consent Banner by Real Cookie Banner