Resolving Power Quality Challenges in a Dual-Source 33 kV API Facility.
Diagnosing and fixing power quality problems in an API plant supplied from two 33 kV sources.
The Situation.
An API facility supplied from two 33 kV sources was living with power quality problems that affected reliability and equipment life, and earlier checks had not found the cause.
What We Did.
- Measured power quality at the points that mattered across both supplies
- Traced the root causes across the two sources
- Recommended corrective measures for the plant's operating conditions
The Result.
- Root causes identified across both 33 kV supplies
- Corrective measures defined to protect reliability and equipment life
Facing Something Similar?
Tell us the asset, the location and the stage. We'll share comparable work and a proposed scope.