The challenge
A cable failure caused a prolonged outage at a 40 MW solar plant. The utility needed to assess the remaining cables and identify locations requiring attention before another failure disrupted generation.
Our approach
- Performed UHF partial discharge testing at cable terminations and joints.
- Identified locations showing partial discharge activity.
- Reported the findings with recommended corrective actions.
The outcome
The assessment identified cable defects and gave the utility a basis for directing repairs to the affected locations. The work supported maintenance decisions across the plant rather than relying only on the failed cable as an indicator of wider condition.
What this means for the owner
After a cable failure, condition assessment can help an operator decide which remaining assets need attention and how to prioritise the next intervention.
Client: Power utility. This summary reflects the recorded project scope and outcomes. Project references are available subject to client confidentiality.