Cable Condition Assessment in a 40 MW Solar Plant.
UHF partial discharge testing for a Gujarat power utility after a cable failure caused a long outage.
The Situation.
A cable failure in a 40 MW solar plant caused a long outage. The utility needed to know the condition of the remaining cables before more failed.
What We Did.
- UHF partial discharge testing of cable terminations and joints
- Identified locations showing partial discharge activity
- Reported findings with recommended actions
The Result.
- Cable condition assessed across the plant
- Defects located so they could be repaired before failure
Facing Something Similar?
Tell us the asset, the location and the stage. We'll share comparable work and a proposed scope.