₹12.3 Lakhs in Losses Due to Deferred Maintenance – 5 MW Rooftop Solar Plant.
How postponed maintenance on a 5 MW rooftop plant turned into measurable generation losses, and what restored performance.
The Situation.
Routine maintenance on a 5 MW rooftop plant was postponed. Generation fell below what the plant should have produced, and the shortfall went unnoticed until it showed up in revenue.
What We Did.
- Compared actual generation with expected generation for the period
- Traced the losses to the maintenance items that had been deferred
- Set out the maintenance and monitoring needed to recover and protect yield
The Result.
- About ₹12.3 lakhs of potential revenue identified as lost to deferred maintenance
- A clear maintenance plan to stop the losses recurring
Facing Something Similar?
Tell us the asset, the location and the stage. We'll share comparable work and a proposed scope.